More capacity. Clearer options.
A full breaker box does not automatically mean your electrical service is too small. Breaker spaces, equipment condition, and available capacity are different issues.
Panel replacement
A like-for-like replacement addresses equipment condition. It does not automatically increase the power available to your home.
200 amp service upgrades
Ask for a load calculation before deciding on additional capacity. The scope can include the panel, service conductors, meter equipment, grounding, utility coordination, and inspection.
Alternatives worth comparing
A subpanel adds breaker spaces without increasing service capacity. Suitable load management may be another option for some projects.
Compare the full installation scope
Panel condition, location, service size, utility work, wiring access, and required updates affect the estimate.
Request an itemized written estimate. Clarify permits, utility work, access, cleanup, and approval for changes to the agreed scope.
Prepare for the first conversation
Describe planned equipment, recurring trips, and visible corrosion. Leave the panel cover in place.
Jacksonville’s Building Inspection Division handles electrical permitting and inspection questions. Confirm the authority for the property address and ask who is responsible for the permit and final inspection.
City permit and inspection contacts ↗